Personal tools
You are here: Home Apply for resources Available resources Large scale applications Spring 2012

Large scale applications Spring 2012

Available resources at SNIC-centra for large scale applications

The table below summarizes the currently available SNIC resources.

  • Total size: gives the total number of core hours/month on the resource that are available to SNAC projects
  • Spring 2012: gives the number of core hours/month to be allocated for large projects during the Spring 2012 application round. 
  • Medium Limit: gives the upper limit of medium level allocations in core hours/month. The requested allocation has to be above this level for at least one resource in a large scale application.
Centre
Resource
Total Size
Spring 2012
 Medium Limit
Notes

C3SE

Beda

1 040 000

130 000

80 000

 


Glenn

1 813 000

450 000

120 000


HPC2N

Akka

3 870 000

800 000

80 000

Will be decommissioned at the end of 2012. This round only 6 months allocations.

 


Abisko

10 990 080

3 800 000

160 000


LUNARC

Platon

1 040 000

130 000

80 000

 



Alarik

2 000 000

250 000

80 000

Available from 20120201.

NSC

Neolith

4 200 000

0

80 000

Will start to be decommissioned during the second half of 2012 when stage one of Triolith is in production. Projects with allocations will be transfered to Triolith.

Triolith

13 824 000

2 200 000

200 000

Will be installed during 2012. Part I is planed to be in production at the end of Q2 2012 and the full system at the end of the year. Allocations will be scaled by a factor 1.6 to a total of 3 520 000 core hour when the full system is in production.

Kappa

1 000 000

250 000

80 000


PDC

Lindgren

23 775 000

7 500 000

200 000

 


UPPMAX

Kalkyl

1 040 000

260 000

80  000

 



Tintin

1 583 000

395 000

80 000

 


Nordic HPC (NHPC)

-

646 000

0

-

 


SweGrid

-

1 350 000

250 000

80 000


 

Please note: When specifying disk space, the term Temporary refers to space used during an individual batch job. Permanent refers to space for storage during the project's allocation period.
Document Actions